Africa’s first waste to energy plant launched in Ethiopia
– By Jerome Onoja Okojokwu-Idu

Follow us on:

In what many have termed as an exciting advancement, Africa’s first waste-to-energy facility was recently launched in Addis Ababa, Ethiopia.

The facility, called Reppie, is located next to the capital city’s main refuse dump known locally as Koshe, a slang word meaning “dirt” in Ethiopia’s main language, Amharic. The construction of Reppie began in 2014 at an estimated cost of $118 million under an agreement signed between Cambridge Industries Limited and the Ethiopian government.

The facility, which will be owned by Ethiopian Electric Power Corporation (EEPCo), will generate up to 25 megawatts (MW) of non-fossil-fuel power through a controlled combustion process consuming 1,400 tonnes of waste daily to add to the national electricity grid.

Source: Ventures Africa

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Newsletter

Get to read our latest stories right in your email

Show some Love. Share this post

Copyright 2022. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from Majorwaves Energy Report

Show Buttons
Hide Buttons